Cardboard packaging — from 100 pcs, 2–5 working days; food packaging and HoReCa — from 500 pcs, 3–5 working days; rigid lid-and-base boxes from bookbinding board — from 30 pcs, 7–15 days; multi-page products — from 10 copies, from 1 day; sheet advertising — from 100 pcs, from 1 day. Below that: a plotter prototype from 30 minutes and a digital pilot batch in 1–2 days.

Why 100, 500 and 30 pieces

A box has no price per piece — there is a price of the run: plates, die and make-ready are divided across the whole run, so the same box at 5,000 pieces can cost several times less than at 300; how many blanks fit on the sheet matters too.

Cardboard packaging — from 100 pcs: an offset run starts there and becomes economical from a few hundred, where the unit price falls noticeably. Food packaging and HoReCa — from 500 pcs; some products only make sense at higher volumes: for 300–499 pcs the lead time is on quotation, and french fry boxes are ordered from 2,000 pcs. Rigid lid-and-base boxes — from 30 pcs: wrapping over greyboard, magnets, inserts — a separate economy with a large share of manual and line assembly; small batches for samples and limited editions; a run becomes economical from a few hundred.

Offset or digital: the boundary

Digital printing pays off on small runs and tests, offset — from several hundred copies: offset has one-off make-ready costs that pay back on volume, digital has minimal make-ready, but the unit price barely falls as the run grows.

Both in-house: Heidelberg with a coating unit and Manroland offset presses, plus a press-class Konica Minolta digital department for pilot batches and reprints; the usual path: prototype → pilot batch printed digitally → production run on offset (more in “Offset or digital for packaging”).

Minimums and lead times by product

Product typeMinimum orderProduction timeOffset or digital
Cardboard packaging: self-assembly, window and gift boxes, bagsfrom 100 pcs2–5 working days; from 1,000 pcs — by production scheduleoffset + die-cutting; up to 100 pcs — digital + plotter
Food packaging and HoReCa: cakes, takeaway, deliveryfrom 500 pcs (300–499 — on quotation)3–5 working daysoffset with food-safe inks + die-cutting
Rigid lid-and-base boxes from bookbinding boardfrom 30 pcs; economical from a few hundred7–15 daysoffset + wrapping over greyboard, assembly on an automated line
Multi-page printing: catalogues, brochures, booksfrom 10 copiesfrom 1 day — digital; offset — by machine-load schedule, after artwork approvalpress-class digital / offset
Sheet and advertising printing: booklets, flyers, posters, POSfrom 100 pcsfrom 1 day (POS — without a new die and without mounting)digital / offset
Labels and stickersfrom 100 pcs — total across the orderfrom 1 dayoffset or digital; all designs in a single press run
Pilot batchup to 100 pcs1–2 days; price on requestdigital + plotter, no plates, no die
Structural prototype1 samplefrom 30 minutes; printed sample — 1–2 daysplotter; digital

Production times; the shipping date comes from the machine-load plan. In high season lead times can grow: December is the busiest production month, so gift and Christmas runs should be placed in September–October.

What speeds up a run

  • A ready die. A new die has to be engineered, made and set up — that is days; we hold more than 3,000 ready dies — if yours matches, the run ships sooner.
  • A repeat run. The fastest scenario: the die exists, the artwork is approved, the job ticket is in the system — nothing left to re-approve.
  • Material in stock. A large run can be held up not by the press but by board from a supplier; GC1 cartonboard at 215–290 g/m² is, as a rule, in stock.
  • Artwork accepted first time. Prepared to our artwork requirements, most prepress comments are resolved in a single iteration.

What delays a run

  • A new structure. Making the die adds days; for fast food packaging a new order takes 1 extra day for the prototype and structure approval.
  • Artwork errors. RGB instead of CMYK, no bleed, a design that ignores the die-line, finishing not separated into layers — the file goes back and your slot in the production queue moves on (see “5 packaging artwork mistakes”).
  • Approvals. Production starts only after an approved control proof; a production offset run — after the samples are approved, rigid boxes — after the artwork and prototype are approved.

Rush orders: what is realistic

Rush orders are on quotation, depending on production load; for rigid boxes a rush run is possible by agreement with production — it depends on line load and material availability. Two offset presses mean reserved capacity, short and urgent runs are printed in the digital department, and someone else’s rush order does not move your date in the plan. See: Order process, Box printing cost, Production and technology.

Frequently asked questions

What is the minimum order quantity?

Cardboard packaging — from 100 pcs, food and HoReCa — from 500, rigid boxes — from 30, multi-page — from 10 copies, sheet advertising and labels — from 100; below that — a prototype and a digitally printed pilot batch.

Can I order fewer than 100 boxes?

Yes, by a different route: a pilot batch of up to 100 boxes is printed digitally and cut on a plotter in 1–2 days, no plates, no die; price on request. Rigid boxes — from 30 pieces.

When does offset pay off?

The benchmark is from several hundred copies: the boundary is set by make-ready economics and depends on the format, board and finishing; we cost both configurations and show the comparison before launch.

How long does production take?

Cardboard packaging — 2–5 working days, food — 3–5 working days, rigid boxes — 7–15 days, multi-page and sheet printing on digital — from 1 day; the exact date comes from the machine-load plan once the artwork is approved.

Can a run be done urgently?

On quotation, depending on production load; for rigid boxes — by agreement with production. Short and urgent runs go digital; a structural prototype is ready from 30 minutes.

How can I speed up the run?

Ask about a ready die before the design starts, send artwork to the requirements, and state 2–3 quantity options and the packaging’s purpose up front — especially food contact. A repeat order runs from the stored job ticket — nothing left to re-approve.